![]() The open end activity is the activity that does not have any successor. What Is An Open End Activity In Primavera? ![]() it represents a hierarchical breakdown of a Project into elements and deliverables.ĥ. Its the longest path through the project with the least amount of float,Filter the activities with total float equal to or less than 0. How Can You Define The Critical Path In Primavera? Project Must Finish byandatory Start / Mandatory Finishģ.What Are The Difference Between Free Float, Total Float And What Is Different Between Float And Slack?įloat and slack are the two different words for the same meaning.Īmount of time, an activity can be delayed without delaying the successor activityĪmount of time, an activity can be delayed without delaying the project finish date.Ĭonstraints in primavera is to fix the start or finish date as per following options: